top of page
Search


LA Garage Conversion ADU Timeline & Permits 2026
Garage conversion ADUs in LA typically take 4–9 months from planning to finish. Permits, slab plumbing, and Title 24 compliance drive the schedule. Why this matters in January January submissions in Studio City, Pasadena, and Anaheim often clear plan check faster than spring filings. Why garage conversions are popular Garage ADUs reuse existing structures. Benefits include: Lower cost than ground‑up ADUs Faster approvals Minimal grading They are common in Sherman Oaks, Missi
Richard Golding
Jan 181 min read


Los Angeles ADU Investment Guide 2026: Costs, ROI, 60-Day Permits & Rental Income by Neighborhood
ADU Costs, Rent & ROI Across LA Los Angeles ADU construction ranges from roughly $150–$400 per square foot depending on type, location, and finish, translating to total project costs between approximately $90,000 and $400,000+ for typical 600–1,000 sq ft units. Monthly rents across the city span $1,500–$4,200 depending on neighborhood—West LA and Santa Monica command $2,800–$4,200 per month, while San Fernando Valley units rent for $2,000–$3,200 , and East LA sits around
Richard Golding
Jan 58 min read


LA Kitchen Remodel Cost Guide 2026: Ranges, Title 24, and Permit Steps
In Los Angeles, Orange County, and the San Fernando Valley, kitchen remodels vary widely in cost. Most fall between $55,000 and $175,000 depending on layout changes, finish level, and energy compliance. Title 24 lighting requirements influence fixtures and controls costs. Why this matters in January Homeowners in Santa Monica, Sherman Oaks, Pasadena, and Irvine secure budgets and permits now before spring scheduling crunches. Material lead times, especially for custom cabine
Richard Golding
Jan 52 min read


Bathroom Renovation Costs & 2025 Title 24 Compliance Guide for Southern California
Modern bathroom renovations in LA and San Diego average $20,000–$45,000 for mid-range projects, with labor accounting for 40–60% of costs. New 2025 Title 24 energy code (effective January 2026) requires enhanced ventilation for heat pumps and higher-efficiency fixtures, adding 5–10% to your project budget. Permits typically take 2–4 weeks in San Diego, 3–8 weeks in LA.
Richard Golding
Nov 27, 20257 min read


LA Kitchen Remodel HVAC and Title 24: Ducting, Lighting, and Slab Layout Impacts (2026 Guide)
LA kitchens in 2026 must comply with Title 24 lighting rules, efficient ducting standards, and fresh-air or recirculating ventilation pathways. Slab foundations significantly impact layout flexibility, especially for island ventilation, sink drain placement, and electrical routing. Typical HVAC-related upgrades add $4k to $20k to a kitchen remodel budget, depending on duct length, roof access, and existing electrical capacity.
Richard Golding
Nov 20, 20253 min read
bottom of page
_edited.png)