Los Angeles kitchen remodel permits 2025: LADBS steps, Title 24, and timelines

  • Richard Golding
  • Oct 5
  • 3 min read
Los Angeles kitchen with white oak cabinets and island at sunset

Introduction

Homeowners in Santa Monica, Studio City, Sherman Oaks, Pasadena, Irvine, and Newport Beach want clean lines, better storage, and efficient ventilation. LA kitchens often sit on slab with stucco exteriors. Title 24 energy and mechanical rules shape lighting and fan choices. If you touch walls or move gas, expect plan check, inspections, and sometimes structural review.


Section 1: Which permits do I need for a kitchen remodel in Los Angeles in 2025?

If you relocate plumbing or gas, change electrical, or open a bearing wall, you need LADBS permits. Simple cosmetic work may not. When plans are required, your design professional submits through LADBS. Over‑the‑counter issuance is possible for smaller scopes; structural or hillside jobs go to plan check. LADBS

Common permit types and triggers

  • Building permit for wall removals, headers, or layout changes.

  • Mechanical/electrical/plumbing permits for range hoods, new circuits, and gas line changes.

  • Soft‑story or seismic considerations when opening walls in older multifamily buildings.

  • Hillside lots may require soils or grading consultation before removing walls.

Title 24 notes for kitchen planningCalifornia’s 2025 Energy Code strengthens ventilation and lighting requirements and becomes mandatory for applications filed on or after Jan 1, 2026. Plan 2025 projects with these specs in mind so designs do not need last‑minute changes. Highlights include updated provisions for lighting integral to kitchen range hoods and higher envelope expectations. California Energy Commission+1


Section 2: How long does a permitted LA kitchen remodel take in 2025?

Basic kitchen with no structural work can finish in 6–8 weeks after permit issuance. Add 2–4 weeks for plan check and revisions. With wall removals, beams, or hillside reviews, plan 12–16 weeks total. Appliance and cabinet lead times still affect schedules. Recent industry data shows labor costs remain the primary driver of delays in 2025. AP News

Inspection milestones you should expect

  • Rough MEP: after framing and before insulation.

  • Range hood and venting: sized per code, properly ducted outdoors.

  • Insulation and drywall: for exterior walls or garage conversions.

  • Final: clearances, GFCI/AFCI protection, and appliance hookups verified.

Neighborhood realities

  • Santa Monica: strict work‑hour and noise rules, schedule deliveries off‑peak.

  • Studio City / Sherman Oaks: hillside transport time adds float.

  • Pasadena / Irvine: city plan check queues vary; pad extra time.

Rebates to fold into planning

  • LADWP: higher rebates for Heat Pump HVAC and Heat Pump Water Heaters for purchases and installs on or after Nov 1, 2025. Kitchens often trigger panel upgrades that make heat pump adoption easier. LADWP

  • LADWP EPM summer promo ended Sept 30, 2025; rebate applications are due by Dec 31, 2025 for eligible purchases. LADWP


Step-by-Step Guide / How-To

  1. Scope and code check: Decide layout changes and verify if plan check is required.

  2. Title 24 pre‑check: Choose compliant lighting and ventilation; size the hood and duct. California Energy Commission

  3. Submit to LADBS: File building and MEP permits; request over‑the‑counter when eligible. LADBS

  4. Order long‑lead items: cabinets and appliances; hold framing until delivery windows are set.

  5. Sequence trades and inspections: framing, rough MEP, insulation, drywall, tile, finish, finals.

LADBS kitchen remodel permit application set with forms, pen, and checklist

FAQ

  • Do I need a permit to replace cabinets only? If layout, plumbing, gas, and circuits remain the same, permits may not be needed. Any new circuits, gas changes, or structural work require permits. Always confirm with LADBS. LADBS

  • Will Title 24 change my 2025 project? It applies to applications filed 1/1/26 and later, but planning now avoids redesign. Expect updates to lighting and ventilation details. California Energy Commission+1

  • How long is plan check in LA? Small scopes can be over‑the‑counter. Structural or hillside jobs often need 2–4 weeks of plan check plus revisions. LADBS

  • What about Santa Monica or Irvine permits? Jurisdiction varies outside LA City. We navigate LA City, OC, and San Fernando Valley processes and will route through your local building department.


Author Bio & Expertise

California Construction & Remodeling Experts executes permitted kitchen remodels across Los Angeles, Orange County, and the San Fernando Valley. We plan Title 24‑ready designs and manage LADBS submittals. Typical projects are in Santa Monica, Studio City, Sherman Oaks, Pasadena, Irvine, and Newport Beach.


Start your LA-area kitchen plan with a code‑ready design and clear schedule. See our Kitchens page or Services to book a consult today.